Define the requirements
Set operating needs, review design assumptions and compare tenant requirements with building evidence.
Keelstead Readiness Profile In development
A five-step planning approach for mission-critical operations in defense, pharma, manufacturing, industrial facilities and data centers. See what must continue, what it depends on and what needs attention next.
A structured planning approach, not a readiness score or certification.
One process. Five connected steps.
The process
Start with one essential operation. Work outward to the systems that support it, the evidence behind your assumptions and the gaps that need a decision. Finish with actions that someone can own.
The Readiness Profile is in development. The examples below show the intended workflow, not a completed assessment. They are fictional and do not establish safe operation or verified performance.
Review prototype / Tenant readiness
Compare tenant requirements with building evidence before commitments and startup plans advance.
Use a separate overlay for each tenant and premises. Record operating requirements, examine the evidence, keep critical gaps visible and organize preparation work, proposed responsibilities and cost ranges.
For commercial and low-hazard light-industrial planning. Separate from the free planner; no automatic synchronization. No readiness score, lease approval or permission to operate. Qualified technical and legal review remains essential. Not available to buy yet.
Explore the tenant workflowEssential operations
Choose the operation before looking at equipment. Define the service it provides, the people it serves and the minimum useful outcome during a disruption.
Dependencies
Trace the people, utilities, equipment and suppliers that make the operation possible. Include the connections between them and any reported backup or workaround.
Evidence
Connect each expectation to a source. Separate records and observations from assumptions, and note what the source does not establish.
Critical gaps
Compare expected service with the operation’s needs. Surface missing evidence, unclear dependencies and unresolved decisions for responsible review.
Action plan
Translate gaps into specific review tasks. Define the expected outcome, assign a responsible role and track decisions through follow-through.
Build the business case. Compare documented project costs with measurable operating savings. Show payback assumptions and potential avoided losses separately. Scenario estimates are not guaranteed savings.
A free place to start today
The existing Disruption Planner lets you work through a scenario and organize expected effects, open questions and practical review steps.
Current rules-based tools, separate from the Readiness Profile in development. Use public or fictional information only. No automatic saving. Planning support, not engineering, safety or compliance determinations.
Digital products & kits
Set operating needs, review design assumptions and compare tenant requirements with building evidence.
Map dependencies, explore outage decisions and organize capital options for responsible review.
Facility Resilience & MEP Capital Prioritization Kit · Facility Outage Readiness & Tabletop Kit
Capture field observations and prepare source-based documentation with clear review limits.
Keep owners, decisions, open items and closure evidence visible through handover.
MEP Decision Closure Kit · MEP Handover & Operational Readiness Kit
Browse the current kit catalog by the work you need to do. These working editions and prototypes are not available to buy yet; pricing and release reviews are pending. They support planning and coordination, not a validated rating, certification or permission to operate.
Keelstead was founded by a licensed engineer and veteran with experience in military and federal infrastructure. It creates practical tools to help owners, facility teams and contractors understand building-system dependencies and make better-informed decisions.
About Keelstead